Rutgers Stadium
RUTGERS STADIUM
 
Contracting Agent:
Nacirema Environmental

Project Location:
New Brunswick, NJ

Project Highlights:
Atlantic Concrete Cutting was contracted to use diamond grinding to remove the epoxy coating on the concrete slab of the top level of the stadium. This was being done to prepare the surface for pouring of a self-leveling compound. A proprietary vacuum system was used to control the concrete dust.

 

Click the play button below to watch a sample video of Epoxy Coating Removal.
 

 

Rutgers Stadium

Grinding off the epoxy coating

Vacuum system to remove dust

Grinding off the epoxy coating

The removed epoxy

The flor after removal of the coating