INTERSTATE 295 OVER ROUTE 30
Contracting Agent:
R.E. Pierson
Project Location:
Bellmawr, NJ
Project Highlights:
Atlantic Concrete Cutting was contracted to saw cut the "Jersey" barriers free from the road surface of I-295. Atlantic used a special machine known as a curb saw to cut the barriers flush with the roadway.

Cutting underneath the barriers.

Removing the barriers with a modified loader.

The road surface just after removal of the barrier wall.

The remaining few inches of barrier are chipped away, leaving a trench.

The trench left by the removal of the barrier is coated with adhesive.
 The trench, now filled with asphalt.

The roadway after the modification is complete.