LACY ROAD BRIDGE
 
Contracting Agent:
George Harms Construction

Project Location:
Forked River, NJ

Project Highlights:
Atlantic Concrete Cutting Scarified 3,200 square foot of bridge deck to prepare the surface for overlay. 1/4 inch of material was removed to expose fresh concrete and to create a ridged surface to enhance the bond of the overlay. A custom vacuum system was used to eliminate air born silica contamination.

High-powered vacuum system to eliminate harmful concrete dust

Two scarifyers on the job

Before (right) and after (left) scarifying