Contracting Agent:
George Harms Construction
Project Location:
Forked River, NJ
Project Highlights: Atlantic Concrete Cutting Scarified 3,200 square foot of bridge deck to prepare the surface for overlay. 1/4 inch of material was removed to expose fresh concrete and to create a ridged surface to enhance the bond of the overlay. A custom vacuum system was used to eliminate air born silica contamination.