Atlantic Concrete Cutting
   Newsletters & Articles     Customer Satisfaction Survey


Crash at Greenwood Avenue Bridge
GREENWOOD AVENUE BRIDGE OVER RT. 24
 
Contracting Agent:
Anselmi & Decicco, Inc.
 
Project Location:
Greenwood Avenue Bridge over Rt. 24
Madison, NJ
 
Project Highlights:
A 5000-gallon septic tank truck had blown a tire on Route 24 and driven up the highway embankment, colliding with the Greenwood Avenue overpass. Atlantic Concrete Cutting was hired to remove the bridge deck of the damaged bridge to allow for repairs. Atlantic provided two saws on the job, each set up for different cutting depths. This arrangement prevented the down time of blade changes when cutting the different thicknesses of the bridge deck, which kept the removal process moving quickly. Final cuts where performed in minutes, allowing for minimal disruption of the traffic below, which was not permitted to pass underneath the bridge while the large concrete sections were in the final stage of removal.

Slab Sawing

Slab Sawing

Bridge Deck Removal

Bridge Deck Removal

Bridge Deck Removal



Back to Projects
Back to Road & Slab Sawing

© Atlantic Concrete Cutting